Free Embroidery Production Utility
Embroidery Stitch Time &
Run Cost Calculator
Calculate exact machine run times across 1 to 12-head machines. Factor stitch counts, SPM speeds, thread trims, and hooping labor.
1. Design & Stitch Count
Stitches, thread changes, and order volume
7.5k Stitches
Quick Stitch Presets:
2. Machine Setup & Speed
Head capacity, stitches per minute (SPM), and shop burden
4-Head Machine
Operator Frame Loading / Hooping Delay:45 sec / batch
Machine Cycle Output
Total Machine Run Time
2.2Hours
(134 total production minutes across 12 machine runs).
Run Time / Garment
10.4 minutes
Rate / 1k Stitches
$0.46 / 1k
Machine Labor Cost
$144.63
Decorating Cost / Shirt
$3.98 / unit
Automate This In The Print Life
Flat $49/mo • Live Multi-Head Embroidery Matrices
Explore Our Full Embroidery OS
The Print Life handles multi-head machine scheduling, stitch count tiered pricing, and digitizing approval workflows on 1 single platform.
Embroidery Machine Science